1. Home
  2. »
  3. Uncategorized
  4. »
  5. Engineering Non-Standard 40ft Bunded Containers for Australian Gold Mine Workshops

Table of Contents

Picture of Ivy Wang

Ivy Wang

Hi, I‘’m Ivy Wang, Co-Founder of Leeta Metals. I've been in stainless steel IBCs and custom shipping containers for more than 10 years. I'm glad to share useful industrial knowledge with you. If you need any custom solutions, please feel free to contact us any time!

When loading heavy machinery from above is necessary, why is an Open Top container better than a standard one, and what does the tarp cover process involve?

Last month, I watched a client try to maneuver a 12-ton CNC machine through a standard container door. Twenty minutes of scraping, repositioning, and frustrated radio calls later, they gave up. The machine was three inches too tall. That's when they called me about open top containers — and I've been fielding similar questions ever since.

Open top containers solve the dimensional puzzle that standard containers can't. When your heavy machinery exceeds 7'8" in height or requires crane loading, the removable roof and tarp covering system of an open top container becomes your only practical shipping option. You load from above with a crane, secure the tarp roof, and ship without the spatial restrictions of a standard steel door frame.

crane loading heavy machinery into open top shipping container

Here's the reality: standard containers work beautifully for 90% of cargo. But that remaining 10% — oversized mining equipment, manufacturing machinery, custom industrial installations — needs vertical clearance. And trying to force-fit heavy equipment through a 7'6" tall door opening isn't just impractical; it's expensive when you damage both the machine and the container.

When Loading from Above Is the Only Way In

Ever tried posting a couch through a mail slot? That's essentially what you're doing when you attempt to side-load tall machinery into a standard container.

Standard containers feature doors on one end only, with a maximum opening height of 7'6". When your equipment stands taller, weighs several tons, or has an awkward center of gravity, crane loading from above becomes the only safe, practical entry method.

I saw this firsthand with an Australian mining client last quarter. They had a custom ore separator standing 9 feet tall. The machine couldn't tilt — doing so would damage precision internal components worth $40,000. The only solution: crane it straight down into an open top container.

Here's when vertical loading becomes necessary:

  • Equipment height exceeds 7'8" (the internal height of a standard 20' or 40' container)
  • Weight distribution requires overhead lifting points rather than forklift or pallet jack access
  • Machine configuration prevents horizontal entry — think L-shaped equipment or units with protruding components
  • Site access limits ground-level loading — construction sites with overhead cranes but restricted horizontal access

The math is straightforward: if your machinery can't physically fit through a standard door, or if horizontal loading risks $50,000+ in equipment damage, an open top container isn't an upgrade — it's your baseline requirement.

Why an Open Top Beats a Standard Container (and What It Costs You)

Let's talk money. Open top containers rent for roughly 20-30% more than standard containers. A 20' standard might run $150/month; the open top version hits $190-220/month.

Open top containers provide removable roof bows and weather-resistant tarp systems, allowing crane access while maintaining weatherproof cargo protection. Despite costing 20-30% more than standard containers, they prevent equipment damage, eliminate rigging complications, and reduce loading time from hours to minutes for oversized machinery.

open top container with tarp cover and securing mechanism

Here's the cost breakdown I give clients:

Container Type Monthly Rental Loading Method Time to Load
Standard 20' $150-180 Side door, forklift 45-90 min
Open Top 20' $190-220 Overhead crane 15-30 min
Standard 40' $220-260 Side door, forklift 90-120 min
Open Top 40' $280-340 Overhead crane 20-40 min

But the premium pays for itself in three ways:

  1. Damage prevention — No scraping machinery against door frames, no tilting equipment that shouldn't tilt
  2. Labor efficiency — Crane loading takes 15-30 minutes versus 1-2 hours for complicated door maneuvering
  3. Flexibility — Load, unload, and access cargo from above at origin, during transport stops, and at destination

One German manufacturer told me they damaged $8,000 worth of precision tooling trying to save $300 on container rental. That's the conversation that ends the cost debate.

The Top Cover Process, Step by Step

The tarp covering system intimidated me the first time I saw one. It looked complicated. It's not — but it does require following the sequence correctly.

The tarp cover process involves: positioning removable roof bows across the container top, unfolding the weather-resistant vinyl tarp over the bows, securing the tarp edges with locking bars or rope tensioners along the container rails, and verifying water-tight seals at all corners and seams before transport.

Here's exactly how it works:

Step 1: Position the roof bows Steel roof bows slot into pockets along the container's top rails. Space them evenly — typically 3-4 bows for a 20' container, 5-6 for a 40'. These create the support structure.

Step 2: Unfold the tarp The vinyl tarp unfolds from one end. Two people make this easier, but I've done it solo when necessary. Drape it over the roof bows, ensuring equal overhang on both sides.

Step 3: Secure the sides Locking bars or rope ratchets secure the tarp edges into the side rail channels. Start at the corners, then work toward the middle on each side. Tension matters — too loose and water pools; too tight and you risk tearing.

Step 4: Seal and inspect Check every corner and seam. Water always finds the path you missed. I run my hand along the full perimeter, feeling for gaps.

The entire process takes 20-30 minutes with experience. For dangerous goods shipping containers or blast resistant enclosures using open top designs, we add secondary weatherproofing and verify seal integrity twice.

Frequently Asked Questions

Can open top containers handle the same weight as standard containers?

Yes — open top containers have the same structural weight capacity (20' holds roughly 28 tons, 40' holds about 27 tons) because the strength comes from the floor and corner posts, not the roof. The removable top doesn't compromise the foundation.

Do tarps actually keep rain out during ocean transport?

Quality vinyl tarps with proper tensioning create weatherproof seals. I've shipped equipment through Pacific storms and Australian monsoons without water intrusion. The key is correct installation and inspection before departure.

How much vertical clearance do you actually gain?

A standard container gives you 7'8" internal height. Remove the roof, and you're loading equipment up to 9'6" tall (the maximum road-legal height for a container on a truck chassis). That's nearly two feet of additional clearance.

Can you access the cargo during transport?

Yes, but it requires planning. The tarp system allows mid-journey access if needed — useful for multi-drop shipments or customs inspections. Just budget time to properly reseal the tarp afterward.

What about securing tall cargo inside?

We use adjustable tension straps anchored to floor lashing rings, plus wooden bracing when necessary. The key is preventing lateral movement while the container moves. I typically design custom blocking for machinery over $50,000 in value.

Conclusion

When your heavy machinery won't fit through a standard container door, open top containers stop being an option and become the requirement. Yes, they cost 20-30% more. Yes, the tarp covering system adds a process step. But when the alternative is damaged equipment, wasted labor hours, or physically impossible loading scenarios, that premium disappears into the noise.

I manufacture stainless steel IBC tanks, custom fuel boxes, and specialized shipping containers — including open top configurations for clients in Australia, Germany, Canada, and the USA. If you're evaluating container options for oversized machinery, let's talk about your specific dimensions and loading constraints. Sometimes the right container choice saves you ten times its rental cost in a single shipment.

Get A Better Solution Now

Our Sales Normally Reply Within 6 Hrs

Blast-Resistant Building_leeta
Blast Resistant enclosure

Core Technical Data of SS316 Explosion-Proof Enclosures

Core Technical Data of SS316 Explosion-Proof Enclosures I recently received an inquiry for SS316 stainless steel blast-resistant enclosures housing fire suppression valves and piping. The